---
title: "Smoltek has received SEK 6.6 million in project financing"
canonical_url: "https://www.smoltek.com/smoltek-has-received-sek-6-6-million-in-project-financing/24170/"
date: 2026-11-26
author: "Fredrik Liljeberg"
featured_image: "https://www.smoltek.com/wp-content/uploads/2025/11/smoltek-pte-03-1920x1080-1.webp"
categories:
  - name: "News"
    url: "https://www.smoltek.com/category/news/"
tags:
  - name: "battery technology"
    url: "https://www.smoltek.com/topic/battery-technology/"
  - name: "carbon nanofibers"
    url: "https://www.smoltek.com/topic/carbon-nanofibers/"
  - name: "carbon nanostructures"
    url: "https://www.smoltek.com/topic/carbon-nanostructures/"
  - name: "electrolyzers"
    url: "https://www.smoltek.com/topic/electrolyzers/"
  - name: "greenhydrogen"
    url: "https://www.smoltek.com/topic/greenhydrogen/"
  - name: "hydrogen"
    url: "https://www.smoltek.com/topic/hydrogen/"
  - name: "nanotechnology"
    url: "https://www.smoltek.com/topic/nanotechnology/"
  - name: "pte"
    url: "https://www.smoltek.com/topic/pte/"
  - name: "Smoltek Hydrogen"
    url: "https://www.smoltek.com/topic/smoltek-hydrogen/"
---

# Smoltek has received SEK 6.6 million in project financing

Starting with the PTE-track, Sweden’s innovation agency has approved an application from Smoltek Hydrogen, for funding to test Smoltek Hydrogen’s low-iridium electrode (PTE) in a 4 kW PEM electrolyzer stack provided by the German electrolyzer developer Hyworx GmbH. The approved funding amounts to SEK 3.5 million.

The project follows a letter of intent signed by Smoltek Hydrogen and Hyworx on November 10, 2026. The parties plan to integrate the electrode (PTE) into the Hyworx stack during the second half of 2027. Subsequently, according to the project plan, an external laboratory will test the stack for 1,000 hours and compare its performance against Hyworx’s reference solution.

## [](https://www.smoltek.com/smoltek-has-received-sek-6-6-million-in-project-financing/24170/#funding-for-new-battery-technology)Funding for new battery technology

In November, Smoltek was also awarded a grant of approximately SEK 1.1 million from Vinnova to drive the development and industrial validation of our proprietary technology, based on carbon nanofibers (CNF), for battery applications.

In October, Smoltek secured a total of approximately SEK 2 million in funding from the Swedish Energy Agency (Energimyndigheten) to support the development of next-generation battery technology.

This funding, totaling SEK 3.1 million, enables us to explore new applications for our proprietary technology platform—based on carbon nanofibers (CNF) within the field of advanced energy storage solutions.

The funds support two projects conducted in collaboration with RISE and Chalmers University of Technology, focusing on material verification and the development of expertise for next-generation battery technology. Through these projects, Smoltek gains access to leading research expertise and infrastructure, which accelerates the evaluation and development of our CNF technology for the battery sector.

* * *

Read the official press releases:

- [*Smoltek Hydrogen Receives Vinnova Funding for Stack Testing with Hyworx*](https://news.cision.com/smoltek-nanotech-holding-ab/r/smoltek-hydrogen-receives-vinnova-funding-for-stack-testing-with-hyworx,c4429013)
- [*Smoltek receives SEK 1.1 million in funding for battery technology projects*](http://Smoltek%20receives%20SEK%201.1%20million%20in%20funding%20for%20battery%20technology%20projects%20https://news.cision.com/smoltek-nanotech-holding-ab/r/smoltek-receives-sek-1-1-million-in-funding-for-battery-technology-projects,c4429173)
- [*Smoltek Receives a Total of SEK 2 Million in Funding from the Swedish Energy Agency*](https://news.cision.com/smoltek-nanotech-holding-ab/r/smoltek-receives-a-total-of-sek-2-million-in-funding-from-the-swedish-energy-agency,c4414058)